|
This process prepares an un-scored Top Floor for wiring with tapewire before the floor is attached (instruction step 14). Other preparation for wiring:
Notch the top* of the Top Floor to complete the E-Slot before attaching the Roof (more on that soon)
|
DHTMLGoodies.com
So we'll make a slot from the ceiling side of the floor (the bottom)
907TopFloor04L.png
DHTMLGoodies.com
Take off a little from the center for the thickness of the tapewire
907TopFloor12L.png
DHTMLGoodies.com
I can trace and paint following the instructions right over the plug
907TopFloor16L.png
|